A Full Backyard Remodel, Step by Step: What Los Angeles Homeowners Should Expect

Alex Carter By Alex Carter November 25, 2026

Landscaping contractor Shai Elbaz walks through a full Los Angeles backyard remodel in order, from design and drainage on clay soil to hardscape, planting and lighting

Paved backyard patio with a covered outdoor kitchen, boulders and a lawn under a blue sky

Photo by Derwin Edwards on Pexels.

In short: A full backyard remodel in Los Angeles follows a fixed order for a reason. First comes consultation and design, then a check of drainage and clay soil, then grading and underground work, then hardscape, and only then planting, irrigation and finishing touches. If drainage and the base are done properly at the start, the finished yard handles winter rain and summer sun far better. If they are rushed, problems usually show up later, when they are harder and more disruptive to fix.

By Shai Elbaz, Founder, Green Advisor Inc., License #1065856 (C-27 Landscaping and B-General Building)

This guide walks through each stage in the order it actually happens, so you know what to expect before work begins, while crews are on site, and at the final walkthrough. It is written from the day-to-day experience of Shai Elbaz and the team at Green Advisor Inc., who design and build outdoor spaces across Los Angeles and Southern California.

Step 1: Start with consultation and design

Every remodel should start with a conversation about how you actually live outside. Do you cook and eat outdoors, need open space for children or dogs, want shade in the afternoon, or prefer a low-maintenance yard you can lock up and leave? Your answers decide the layout far more than any photo does. From there, a design sets out zones for dining, planting, circulation and quiet corners, and fixes sizes and levels before anyone picks up a tool. Take time at this stage to confirm materials, finishes and the position of major features in writing. Changes on paper are simple. The same changes after grading or concrete work has started are disruptive, and sometimes mean redoing work that is already in the ground.

Step 2: Assess the site honestly

Before the design is final, the yard itself needs checking. In Los Angeles that usually means looking at soil, slope and sun. Much of the area sits on expansive clay soil, which swells when it gets wet and shrinks as it dries. That movement matters for patios, walkways and planting. The assessment should also note where water currently pools after rain, which fences and walls cast shade, where access is tight for materials and equipment, and what is worth keeping, such as a healthy tree or a sound wall. A design that ignores these conditions may look right on paper and still perform badly in its first winter.

Step 3: Solve drainage and prepare the soil

Drainage is the least visible part of a remodel and the most important. On clay, water does not soak away quickly, so without a clear route out, it sits against patios, seeps under paving and leaves planting beds waterlogged in winter rain, then baked hard in summer. Good preparation gives water somewhere deliberate to go, sets correct falls away from the house, and prepares the soil in planting areas so roots can establish. For hardscape areas, it means excavating to the right depth and building a proper compacted base. Skipping this stage to save time at the start is the most common false economy in a backyard project, because fixing it later means lifting the finished surface first.

Step 4: Demolition, grading and underground work

Once the plan and drainage are agreed, the messy middle begins. Old paving, turf or structures come out, levels are graded to the new design, and trenches are dug while the ground is open. This is the moment to run irrigation lines, drainage pipes and electrical conduit for outdoor lighting, even if the fixtures themselves come much later. Homeowners should expect noise, dust and a yard that looks worse before it looks better during this phase. It helps to agree in advance how materials will come in and out, where waste will be stored, and which parts of the garden, if any, will stay usable while work is under way.

Step 5: Build the hardscape and structures

With the ground prepared, the permanent structure of the yard goes in: patios, paths, steps, retaining edges, decking, pergolas or patio covers, and any built features such as an outdoor kitchen. This stage is where the base work from earlier proves its value. Paving and concrete need a stable, well-compacted base and correct falls, or they can crack, sink or hold puddles as the clay below moves through wet and dry seasons. Materials should also be chosen for Los Angeles sun, not just for how they look in a showroom. Some surfaces get very hot in direct afternoon sun, and some finishes fade or become slippery when wet, so ask how your shortlist performs in both extremes before you commit.

Hands in work clothes setting red brick pavers onto a leveled sand base
Photo: Littlehampton Bricks / Pexels.

Step 6: Planting, lawn and irrigation

Planting comes after the heavy building work is finished, so new plants are not trampled or buried in dust. Beds prepared earlier can now be planted with species matched to the soil and to each spot’s sun exposure, rather than a single mix used everywhere. Whether you choose natural grass, artificial turf or mostly planting and gravel, the decision should be based on how the area will be used, how much water and upkeep you want, and how it drains. Irrigation is set up and tested at this stage, zone by zone, so beds, lawn and trees each get appropriate water instead of everything being watered the same way.

Garden bed with agaves and aloes set among boulders and pale gravel
Photo: Việt Anh Nguyễn / Pexels.

Step 7: Lighting, finishing touches and walkthrough

The final stage brings the yard together. Outdoor lighting is fitted and aimed, surfaces are cleaned, joints and edges are finished, and small details such as gates, screens and furniture placement are settled. Do the final walkthrough slowly and practically. Run the irrigation and watch for leaks or overspray. Check that water flows where the drainage plan says it should. View the lighting after dark, not in daylight, and open and close every gate. Write down any snags in one list and agree how and when they will be put right, rather than raising them one by one over the following weeks.

What helps the project run smoothly

Three habits help more than anything else. First, make layout and material decisions before building starts, and avoid changing them mid-project unless something is genuinely wrong. Second, expect some disruption and plan for it, especially if you work from home or have pets that normally use the yard. Third, keep one clear channel of communication, so questions and approvals do not get lost between family members, designers and crews. A remodel is a sequence, and each stage depends on the one before it. When the order is respected, the result is a yard that not only looks finished, but drains, wears and grows as it should through its first summer and winter and beyond.

About the author

Shai Elbaz is Founder of Green Advisor Inc., a family-owned landscaping, outdoor living and home remodeling contractor serving Los Angeles and Southern California. He holds California Contractor License #1065856, with C-27 Landscaping and B-General Building classifications. Learn more at greenadvisorinc.com.